The real cost of a stalled application control project
A half-finished application control rollout is the most expensive kind there is. The budget is spent, the posture has not moved, and the meter is still running.
Your Org's Self-Service File Signing
WDACManager Blog
Practical guidance on WDAC, Intune ACfB, Application Abstraction, policy lifecycle design, and controlled enterprise rollout.
16 posts across WDAC and product operations
A half-finished application control rollout is the most expensive kind there is. The budget is spent, the posture has not moved, and the meter is still running.
A properly signed file can appear unsigned in WDAC audit events depending on how it was loaded. Policies built purely from those events end up bloated.
Native image DLLs generate a flood of events that look like a problem. They are not.
Application control projects do not fail because the technology is hard. They fail because the environment was not ready for the control before it was introduced.